For small residential property managers · Email & message records

Scattered repair messages.
One clear landlord report.

Keep the records you already use. Paste repair notes into Mendora, separate each repair and review the wording. Enter the facts you can confirm, then share a readable weekly update.

No signup needed to paste, preview, copy into your own email or download a PDF. Opening the intake does not replace your current draft; only reviewed notes you confirm are added.

Before pasting, remove unnecessary tenant personal details. Keep only what the repair update needs.

Need wording for a delayed repair now? Copy a repair-delay landlord email template → for an unconfirmed contractor visit or awaited part.

01 · Source notes · entirely fictional

The messages you start with.

These properties, repairs and messages are made up. In the intake, put --- on its own line between repairs. Mendora does not extract status, dates, bookings or costs from the text.

Fictional note 1

4 Nov 2026 · 14 Willow Lane, Unit 2 Tap washer replaced today. Final check: no leak. Work complete. Invoice paid: USD 125. No further action. Internal reference: TAP-DEMO-04.

Fictional note 2

6 Nov 2026 · 8 Cedar Court Still waiting for the boiler part; repair delayed, not done. Estimate USD 280, not final. No visit date. Ask the vendor for a delivery update on 9 Nov. Internal reference: BOILER-DEMO-06.

Fictional note 3

14 Willow Lane, Unit 1 Bedroom window latch is loose. Photos requested; review them and request a quote. No date or cost recorded in this note. Current repair status not confirmed. Internal reference: LATCH-DEMO-UNKNOWN.

Manager review · explicitly entered facts

What changed before sharing?

  • Tap: the manager entered Complete, update and completion dates of 4 November 2026, and a confirmed $125 cost. No scheduled date was entered.
  • Boiler: the manager entered Delayed, an update date of 6 November and a $280 estimate. The 9 November follow-up is a next action, not a booked visit.
  • Latch: status, update date, visit date and cost stay unknown. The undated note is included for review, not presented as a dated event.

The manager assigned property and issue labels, edited “What happened” into shareable wording and removed internal references. Original notes stay in the draft for reference; landlord output uses the reviewed fields.

02 · Reviewed report · fictional example

The account the landlord reads.

The period and USD currency were chosen for this example. This is the same report preview used in the builder, not an automatic extraction from the messages.

MendoraLandlord update

Draft · Not finalized

Fictional example · Weekly maintenance report

2 Nov 2026 – 8 Nov 2026

3 updates · 1 complete · 1 delayed · 2 not confirmed complete

Confirmed costs$125.00
Estimates$280.00
Unknown costs1 item

14 Willow Lane · Unit 2 (fictional)

Complete

Kitchen tap leak

Plumber replaced the worn washer. No leak observed at the final check.

Updated
4 Nov 2026
Scheduled date (entered)
Not confirmed
Completion date (entered)
4 Nov 2026
Cost
Confirmed: $125.00

Next step: No further action reported.

8 Cedar Court (fictional)

Delayed

Boiler repair

Vendor is awaiting the replacement part. The repair has not been completed.

Updated
6 Nov 2026
Scheduled date (entered)
Not confirmed
Cost
Estimate: $280.00

Delay: Replacement part has not arrived. A visit date is not confirmed.

Next step: Ask the vendor for a delivery update on 9 November 2026.

14 Willow Lane · Unit 1 (fictional)

Unknown

Bedroom window latch

A loose bedroom window latch was reported. Photos requested to assess the repair.

Updated
Not provided
Scheduled date (entered)
Not confirmed
Cost
Cost not known

Next step: Review photos and request a quote.

Prepared from manager-entered updates. Estimates are not final costs. Blank dates and costs remain unconfirmed.

Try one real repair note.

  1. 1. Paste & separate

    Remove unnecessary personal details. Paste one note, or separate several with a --- line.

  2. 2. Review & enter facts

    Assign labels and edit the landlord wording. Enter only supported status, dates and costs. Review each selected note before confirming.

  3. 3. Preview & share

    Add selected notes without replacing existing work. Check your reporting period, currency and property selection. Copy into your own email or download a PDF.

Paste your own repair notes →

Direct sending is not connected yet. The $49/month subscription is shown on the pricing page; checkout is not available yet.